OFF MARKET
150 56th #11-A
NewYork, Turtle Bay, New York City, NY
OFF MARKET
Asking
$899,000
BTC
9.150
ETH
262.06
Beds
1
Baths
1
Home Size
800 sq. ft.
Year Built
1956
Situated on a high floor, this generously sized, south facing Junior-4 (one bed plus home office or convertible 2) is not to be missed. There is southern exposure in all rooms providing natural light throughout the day. One enters into a spacious living room with beautiful hardwood floors and ample space for a separate dining area. Off of the living room is the second bedroom space which is currently configured as a home office and can easily be used as a den/second bedroom. Grounding the living area is a sizable open chefs kitchen with new stainless steel appliances, an abundance of cabinet space and a large breakfast counter. The well proportioned primary bedroom boasts dual window exposure, generous closet space and can easily accommodate a king sized bed. Exceptional storage throughout with an enormous walk in entry closet. Other features include: soundproof windows, planting terrace and through wall AC units.
150 East 56th Street is a pet-friendly, postwar condominium with a 24-hour doorman, a live-in superintendent, brand new laundry room, private storage, a bike room, a beautiful backyard garden and a large private dog run. This ideal location, at the crossroads of Midtown East and Sutton Place, offers easy access to the best of New York City living. Great shops, stores (Whole Foods, Trader Joe's and Bloomingdales just down the street) services, nightlife and restaurants are at your fingertips. Proximity to great schools with PS 059 and The High School of Art and Design close by.
Extremely convenient to major transportation with the 4,5,6,E and M trains just one block away with the N and Q trains also close by. Central Park within a 5-10 minute walk. Please note there is currently a capital assessment of $161 until 6/2023 and a temporary monthly energy surcharge of $58. Modernization of elevators and hallway renovations are budgeted for and will be completed in the next 12-18 months.
LOADING